
Layer 1 of 7
Design
Decide what each part of the yard is for before anything is sized. The use sets every pad, wall and stair.
Pasadena & the San Gabriel Valley
Bathrooms, kitchens, ADUs, and the whole backyard. An owner-run contractor with one crew that takes one job at a time.


Licensed & insured in California, CSLB #1074934
What we build
From a single bathroom to a whole sloped backyard. The person who quotes your job is the person who runs it.

Cost and timeline are driven by whether the plumbing stays where it is or moves, not by the tile you pick.

The layout decides the budget more than the finishes. Keep the sink, gas and walls in place and it stays mid-range.

Type sets the baseline. After that, how far water, sewer and power have to run decides the rest.

Prep decides how long a coat lasts, not the paint. A crack that keeps coming back means water in the framing.

The base is dug out, compacted and drained before a roll goes down. Turf failures are base failures.

A deeper compacted base and proper edge restraint, so pavers don’t sink, rock or spread.

Lighting, gas and irrigation are trenched in before the hardscape goes down, not chased in afterwards.

Most landscape problems are water problems, so grading and drainage come before planting. Always.

Surfaces that shed water away from the pool, stay comfortable underfoot in summer and meet the coping clean.
How we work
From the first call to the warranty, in seven steps.
Step 1, you call
Free estimate
Michael comes out to walk the job, usually within the same week.
Step 2, on paper
Written scope
A written scope with dollar allowances, so every bid can be compared line for line.
Step 3, the right office
Permits
Pulled with the right authority. Pasadena, LA County or Glendale, depending on the parcel.
Step 4, before demo
Order
Long-lead items are ordered before demolition, so the crew never waits on a truck.
Step 5, on site
Build
One four-person crew on your job, and only your job, until it’s done.
Step 6, checked
Inspect
Every stage signed off. A shower pan is water-tested before a tile goes on.
Step 7
Handover
Walkthrough, punch list cleared, and a three-year labor warranty.


Scroll to follow a job
Step 1, you callFree estimate
Michael comes out to walk the job, usually within the same week.
Step 3, the right officePermits
Pulled with the right authority. Pasadena, LA County or Glendale, depending on the parcel.
Step 5, on siteBuild
One four-person crew on your job, and only your job, until it’s done.
Step 7Handover
Walkthrough, punch list cleared, and a three-year labor warranty.
From the first call to the warranty, in seven steps.
Step 2, on paperWritten scope
A written scope with dollar allowances, so every bid can be compared line for line.
Step 4, before demoOrder
Long-lead items are ordered before demolition, so the crew never waits on a truck.
Step 6, checkedInspect
Every stage signed off. A shower pan is water-tested before a tile goes on.
The road map
Every backyard we build goes in this order, because each layer ends up underneath or against the next. Skip ahead and you end up digging up finished work.

Layer 1 of 7
Decide what each part of the yard is for before anything is sized. The use sets every pad, wall and stair.

Layer 2 of 7
Old asphalt, concrete and tired landscaping come out, and the site is cleared back to soil.

Layer 3 of 7
On San Gabriel Valley clay, standing water has to be moved, not waited out. Ground falls away from the house first.

Layer 4 of 7
Irrigation, gas and lighting conduit go in the trench now, so nobody digs up finished work later.

Layer 5 of 7
Retaining walls, steps and pergolas, with the drainage behind each wall built before the wall itself.

Layer 6 of 7
Pavers, decking and coping, on a base deep enough for what will stand, sit or drive on it.

Layer 7 of 7
Last in, on top of everything else: planting, turf and lights, so nothing gets trampled.
Done once. Done right.
Plan your yard with usRecent work
No stock images. Every photo here is a job our crew built, shot after the last tool left site.
16 photosOutdoor living · San Gabriel Valley
16 photosLandscape construction · Glendale
10 photosBathroom remodeling · San Gabriel Valley
10 photosPool surrounds & grounds · San Gabriel Valley
17 photosWhole-home renovation · San Gabriel Valley
12 photosTurf & outdoor living · Simi Valley
9 photosPainting & exterior · San Gabriel Valley
Your project next?
Tell us what you have in mind. Estimates are free and usually the same week.
Start with an estimateService area
Eleven cities across the San Gabriel Valley. Pick yours to see who issues the permit, because that’s where most jobs lose their first few weeks.
Where’s the house?
Pick a city
Who issues your permit depends on the parcel, not the mailing address. Altadena, for one, goes through LA County, not Pasadena. Getting it wrong costs weeks.



Meet the builder
MKW Homes is run by Michael Ward. He learned the trade in Liverpool, England, and has spent more than twenty years building since. Today he runs one four-person crew in Pasadena that takes one job at a time.
That’s deliberate. A crew split across three sites means nobody is really watching yours. Ours shows up, stays, and finishes.
One crew, one job
Four people, on your job until it’s finished. We never rotate a crew across three sites.
Owner on site
Michael is on the job, not on the phone from another one. The person who quotes it runs it.
Licensed & insured
CSLB #1074934. General liability and workers’ comp, certificates on request.
Mostly referrals
Most of our work comes from neighbors of past clients. That keeps us honest.
Reviews
“Hired Mike and his crew to redo our entire backyard and driveway. Removal of the asphalt and existing landscaping, running water lines and electrical, artificial grass, plant borders, a paver driveway, raised the patio gazebo, added a paver patio, landscaped borders, irrigation and outdoor lighting.”
“He really takes the time to listen to your ideas and vision, while also offering thoughtful recommendations that elevate the final result. Nothing ever felt rushed or overlooked.”
Marvin Valencia
“From start to finish the job was handled with the utmost professionalism and attention to detail. What stood out most was their communication. Mr. Ward kept me informed every step of the way.”
Angela Adams
“MKW Homes just painted our home. We are very satisfied with the work. During the process everything was clean and organized.”
Jake Baloian
“Mike and his crew were great. They did a wonderful job on the stucco patching and painting, and we were very pleased with the results.”
Jen B
“My backyard fence was damaged and his crew replaced the damaged sections. They were done so well that you could not tell they were different.”
Janet Owens
“Mike and his team did an outstanding job on our front and backyard. We have continued to use him on other projects since then.”
Phil Feghali
“Mike and his team came over to paint our house and set up a shade sail. Price was competitive. The team left the house clean after the job.”
Lily Hua
Plan it
Tick what you have in mind. We’ll add it to your estimate request, so Michael knows what to look at when he comes out.
Straight answers
The questions homeowners ask Michael most, answered the way he’d answer them on site.
Whether you keep the plumbing where it is or move it. That moves the number more than tile or fixtures. Moving a toilet drain through old cast-iron waste lines in a pre-war home is what drives cost up.
Usually, yes. Most kitchens take several weeks of work once demolition starts. The calendar runs longer than the labor, because cabinets are ordered before demo, counters are templated only once cabinets are set level, and inspections gate the work.
Usually yes if you move plumbing, electrical or framing. The catch is where you pull it: Pasadena has its own building department, while Altadena is unincorporated county and permits through LA County, not the city.
Building out is usually cheaper, as long as the lot has room and the setbacks allow it. A second story needs an engineer to check the foundation, means taking the roof off, and gives up space downstairs to a staircase.
On most single-family lots, yes. State law sets a floor the city can’t go below, including approval without a public hearing and room for at least an 800 sq ft unit with 4 ft side and rear setbacks.
For a lawn you look at more than you walk on, usually yes: no more watering or mowing. The honest catch is summer heat in full sun. Almost every turf failure is a base failure, so hire for the base, not the blades.
Neither is simply better. Concrete is cheaper up front but cracks and can’t be patched invisibly. Pavers cost more, but any unit can be lifted and reset. Either way, the base and drainage decide how long it lasts.
Verify the CSLB license yourself, confirm general liability and workers’ comp, insist on a written scope with dollar allowances, and treat a bid far below the others as a warning, not a bargain.
Free estimates
Tell us what you’re thinking. Michael will come out, look at the house and give you a written scope, usually within the same week.
Hours
Based in Pasadena, serving the San Gabriel Valley.
CSLB #1074934. Check it yourself.